Go back

Google's AI Infrastructure Chief, Amin Vahdat, on the Physics & Economics of Frontier AI

1h 4m 26s

Google's AI Infrastructure Chief, Amin Vahdat, on the Physics & Economics of Frontier AI

Google’s AI data center buildout represents one of the most capital-intensive and transformative infrastructure shifts in human history. Unlike traditional data centers designed for 20–30 year horizons, AI data centers are now being co-designed with specific workloads, enabling greater specialization, efficiency, and performance. This shift is driven by the rise of AI workloads like long-horizon agents, which demand not just more compute but also increased CPU, memory, and networking capacity. Google’s approach emphasizes "good put"—real-world workload performance—over theoretical metrics such as flops, as system reliability and failure resilience are paramount at scale. The company’s TPU program, started as a contrarian bet in 2013, has matured into a core enabler of AI, evolving from inference to training and beyond. Deep collaboration between hardware teams and DeepMind enables iterative co-design, where model innovations directly shape chip architectures and vice versa. As AI workloads grow more complex and distributed, data center designs must balance specialization with flexibility—such as separating compute, storage, and network elements across physical locations. Power remains the most fundamental constraint, requiring long-term utility partnerships and strategic energy planning. Google also champions open standards and interoperability, ensuring that hardware and software remain flexible and accessible, even as performance demands increase. This holistic, dynamic approach allows Google to maintain agility, performance, and innovation in an era of rapid AI transformation.

Transcription

11253 Words, 62336 Characters

English
In hardware, again, as you know, there is this opportunity where the more you specialize to a particular workload, the less flexible it is, the faster, the more power efficient the hardware is going to be. So it is this art, and it's this projection of what are you designing to, and how persistent is that workload. In other words, if it's going to go away after a month or two months or three months, even if it's big for those three months, you've got a really narrow window to intercept it. So it has to be so much durable, and you have to be able to project exactly what, when you can get for specializing to it. Thrilled to welcome Amin Vedat to the show. I mean, thank you for joining us for today. It's really exciting to be here. Really looking forward to it. I am very excited for today's topic, because we are in the middle of the biggest CapEx build out in human history. You are in the middle of it. Google alone is expected to spend more than $200 billion on CapEx this year, most of which is going into building data centers. You're at the center of it all. He were named the head of Google's AI infra at the end of last year. So you are the man spearheading the effort of one of the most capital intensive buildouts in human history. And so I am really excited to get into it with you today. It's a huge year, for sure. Of course, across the industry, including at Google, really have, I don't think we've ever seen anything like this. Certainly not at Google, but as you said, I think in the history of humanity in terms of the buildouts and the pace of transformation, really unbelievable. Before we get into it, maybe just crash course for the audience. What is an AI data center? How is it different from a non-AI data center? It's a very good question in that AI data center and a non-AI data center have do have a lot of similarities, actually, and they're not radically different. I mean, it consists of concrete and enclosure. It consists of electrical yards, mechanical yards, cooling. You have row after row of power being distributed. There's a huge amount of network infrastructure there. In other words, we connect large amounts of computer to one another. A fair amount of storage infrastructure goes in there. I think that the big difference that we're seeing with AI infrastructure is specialization. In the past, when we're building a data center, it really is a 20, 25, 30 year building investments. And we're thinking about how it's going to be evolving over that 20, 25, 30 year period. You might have servers going to it. You might have networking storage. You might have some accelerators, GPUs, TPUs, whatever they might be going into it. But it's a 25, 30 year planning horizon. And the lifetime of the hardware might be six years. So many generations that we have to plan for. An AI data center oftentimes is going to be more purpose built. So in other words, we are oftentimes co designing the building with the hardware that might go into it. We might be saying, you know what? Actually, we're not going to put a lot of storage into this building. Why? Because a storage rack might have 10, 20, 30, 40 kilowatts of power. You put that next to a TPU rack or a GPU rack that easily is hitting hundreds of kilowatts today might hit megawatts. People are talking about that in the next few years. Designing a building that might take 30 storage racks in a row versus one or two AI racks in that same row. Very, very different design. Just think of it in terms of the size, think of it in terms of the power and how that would be distributed across the building, et cetera. Networking would be the same. The amount of networking that you would need for a storage rack, tiny, I mean, especially if it's hard drives compared to an AI rack. So if you're trying to make it fully fungible, you'll probably make it too big and too overbuilt, fungible over certainly a 30 year period. An AI data center likely is going to be much more purpose built, co-designed with the hardware, even to the point of cooling and power distribution, et cetera. So a lot more co-optimization. You all delivered a big Verrubin cluster to one of my portfolio companies, Ineffable Intelligence, and I saw the photographs of it as it went out. That is a thing of beauty. It is. It is. It's one of those things where, you know, similar to looking at the biggest construction projects in human history, you look at that data center and it's like, wow, that is a monument to what mankind can do. No, we got a nice picture of it, and it, and this is just, you know, a couple of racks, you know, the cabling, the fiber distribution for it is, is really beautiful. I mean, beauty is neither beholder, but for folks like me and probably yourself and others in the audience as well. It is a thing of beauty. We put this picture up on social media and people love the fact that Ineffable by their huge fan of what they're doing, fantastic team. That got a lot of attention, okay, great rack for Ineffable, but actually people just love seeing the pictures of the fiber and the sort of the fact the nature of the fact one of the most popular posts that we've ever had actually was around that. So yeah, absolutely. We're really excited about that. Yeah, I have goosebumps seeing the picture. How do you measure and hold yourselves accountable in the middle of this big bill out? We're talking right before the show about how flops is a vanity metric and you prefer an alternate metric. Can you, can you say more? Yeah, so I think one thing to note is that, you know, whether it's flops or pick your other favorite chip centric metric, these are in theory. In other words, under some conditions for whatever chip you have, this is the maximum amount of flops that you can deliver. What we really care about in the end is, what's the performance delivered by workload? That's that's what we're looking at. So an end rarely, it happens, but actually relatively rarely is that performance determined by a single chip. It's flops, it's HBM, it's SRAM capacity, et cetera. Those are all super important, but it might be how two, four, eight, 16, a thousand, 10,000 more of these chips composed together with not just the accelerators. Again, whether a TPUs or GPUs, but then the CPUs that might feed them the data, the network that connects them all together. So what is the workload that you're running and what is the performance of that workload? One measure that is interesting is what's your flops utilization? So for example, for a particular workload, if you have in theory a terraflop or a pedaflop capable for your workload, which fraction of that are you delivering? Now that's a measure of good put. So you can think of throughput, which is a well known term. That's the throughput that is possible, but now let's consider some other considerations. One is what is the slowdown of the workload? Again, just inherent to the workload, but other aspects of it that really hits our reliability. So in terms of how we hold ourselves accountable, if we have a chip failing for a synchronous workload and many of these workloads, whether training or serving or agentic workloads, there's synchronous. There's many, many components that are working together simultaneously. Now, if you have, let's say, a thousand, 10,000, 100,000 of these components working together simultaneously, and they're really needing to coordinate at microsecond or millisecond granularity, one of them fails, it might actually bring the whole thing to a stop. And because everyone is counting on everyone else to do the part of the job in order to come up with the answer to a really tough question. One of them stops, okay, now we have to figure out what happened, which one stopped. What's the checkpoint that we have of the computation at some previous state in time? How do we restore that checkpoint? How do we restart? Worst case, we have to restart from the beginning. That would be really bad, but that can happen in certain cases, especially on the inference side. The point here is that if you now then have to go back and redo a bunch of computation, if you then have to pause and wait to figure out what happened for the failure, all that work is work. It's not actually helping you get the answer, right? In terms of, let's say that you're working out a problem on paper, step one, step two, step three, step four. If you have to go back to step one, because you've made a mistake, yes, you're still doing work. That's throughput. You're doing work, but what is the good put in delivering your answer? It's basically the total amount of time it took you to solve the problem. That's what matters. And if you have failures, if you have failure recovery, if you have whatever it is that's interrupting your work, that's part of the issue. So now, how do we hold ourselves accountable? It's delivered good put, not theoretical benchmark, throughput, or goodness in theory, but actually for workload, for real failure conditions, what's happening? And the unfortunate reality is that at 100,000 accelerator scale. I was going to say that scale, something's filling all the time, right? And each one of these, as you're aware, each one of these chips is a wonder of nature. I mean, they're at the very bleeding edge of what's possible to manufacture. And so again, to me, it's stunning. And now actually these chips aren't just one chip. The packages made up of, in many cases, two, four, eight, maybe more chiplets that are composing together. And then of course, HBM off to the side, network connectivity, maybe things like co-package optics, no criticism, lots of things can fail. And now if you got 100,000 of them, something is going to fail. You have to be prepared for that, detect that in near real time. cover from that near real time. Doing all that, it's really like finding that the telemetry problem is massive. It's like finding a needle in the haystack continuously across certainly seconds and minutes, but for some of these jobs, hours and days, and even weeks, it's just a continuous and online. How we hold ourselves accountable is, what's the good put that we deliver for the workloads that actually matter in the data center. - Is good put a Google term or is it an industry term? - It's a Google term, but I think more and more people across industry are starting to pick it up. - And then just to calibrate me, 100,000 accelerators scale, are we talking it's gonna fail once a minute, once a day, like how for 100,000? - 100,000 accelerators, so let me see. I think that it is definitely going to be at the scale multiple times a day, and perhaps depending on the exact configuration, multiple times an hour, something is gonna fail. - And what are the most common failure reasons? - This is the problem, actually, it's a very good question. If there were a common failure reason, we'd have figured it out and fixed it. It is a long tail of constant discovery. You know, whenever we have a new product that's being introduced, there's gonna be something that tits us. In many cases, frankly, because again, it's at the very bleeding edge, it might be network-related. It might be how we connect these things together at super high speed. That might be something to do with the hardware. Those things we work through. But then a lot of issues could be software. So this is the other aspect of how we hold ourselves accountable. Again, the chip might be capable of a certain level of flops. But if you have a compiler bug, a runtime bug, a model issue, something else, operating system issue, it doesn't matter. That's going to impact the intense system performance. So you might have perfect hardware, fully reliable, but then you might have software issues that hurt you. - Is there a standard reference stack from the accelerator companies from Nvidia or from the TPU team of, you know, here is the optimal system to build around our accelerators. And as long as you build to that system, you're good. Or how much of your own kind of data center design do you have to do above and beyond with the semiconductor companies give you? - Right, so there's a reference stack. And I mean, I would say that Nvidia is an incredible whole systems company. There are obviously semiconductor company, but they're not just a semiconductor company. They give you a really, really strong reference stack. But I would say that many, we find that the way I'd put it is most of our customers leverage that reference stack, but many also specialize. So in other words, they might find that as natural for their particular use case, they have an optimization opportunity or something different that they need to do. And they're going to do that. Similarly for the TPU side, we have a reference stack. But then, and most people will leverage that, many will specialize it as well, then. Got it. And then I guess in terms of overall capacity, you've told your teams that Google has to roughly double the serving capacity every six months or so, is that right? - Well, so to be clear, this is in terms of effective available capacity from the way in the end that we look at it is from a serving perspective, it's token generation capability. So capacity, then this is where I would say, it's a combination of software and hardware. The hardware might have some quote-unquote inherent level of flops, but I'm saying here is not necessarily, you have to double the number of flops every six months. That's one path. You have to double the capability that hardware to generate tokens every six months. And as much or more of that is going to come from software, as it is from hardware. So in other words, it could be a model optimization that delivers that. It could be some runtime optimization that delivers that. It's really probably going to be dozens or hundreds of individual optimizations that are just landing again and again and again to make it all possible. But yes, the rate of capacity improvement is incredible. - I mean, I guess we've had a few years of data center build out now and a few years of model progress and software progress. What has been the empirical breakdown of how much capacity, maybe as measured by intelligence per watt, how much capacity increase has come from the silicon itself versus the models versus other software and any other kind of big components? - Yeah, it's a really good question. I don't have the exact breakdown, but I would say that in our experience, most of the benefits come from model side improvements in terms of intelligence per watt. And by the way, intelligence per watt is a fantastic metric. You're really focusing. We also, for us, it's a good put per watt and we can come back to why the watts need to be the denominator. Good put could well be a measure of the intelligence delivered per watt. In other words, good put is a workload-specific metric. But I would say most of the gains often come from the model side, software system quite a bit. Why? Because they're able to actually make sure that the hardware that you have is being used effectively. And then the hardware, it is pretty stunning. In other words, we're living in a world right now where 2X or more year-over-year performance improvements is absolutely possible. And so the hardware does support it and it is a, if you want, it's a free multiplier, not free. But everyone else above it can count on it in terms of that being a multiplier that lifts everyone else up year-over-year. I'd love to talk a bit about the TPU program and co-design. So Google started building custom silicon more than a decade ago. I was contrarian call at the time. How is the TPU program evolved? Quite a lot. I mean, when the program started 2013, it was really a contrarian call. And I think that at the time, it's hard to put yourself back into the moment 2013 conventional wisdom. All the smartest, wisest people would say, you don't build a custom built accelerator for a single workload. Why? Because most laws there are doubling of performance every whatever it is, 18 or 24 months is there. You get to leverage standard programming models, all your C++ code, et cetera, Java, Python, whatever it might be is-- Like the bit or less than of chips. Yes, exactly. It's like the bit or less than of chips is that specialization never wins. But in this particular case, it was, we have this one application, or a few, a small number of them that would benefit tremendously and that would require an unimaginable amount of general purpose CPU to support. So really, in 2013, it was a bet. And there were quite a few people, even within the company, I would say, who are not sure that it would work out. So it was a bet. It turned out to be a massively successful bet. So the first chip was all about inference. The second chip was, hey, actually, we can take the same idea and build a training chip. From there, it got picked up for more and more use cases. Around the time, the second chip came out, transformers were invented. And this was a major, major moment. And that actually completely shifted the TPU program. We, of course, learned that recommender systems could run really, really well on the TPUs. And so ads and related use cases came along. So I would say that change in evolution has been one of expansion in scope and impact. In other words, it started with a really impactful use case of a couple of applications for inference serving. This was language translation primarily and voice recognition. To then training, to then transformers, recommender systems, and continuing to generalize, as, I guess, the Gen AI moment took a hold to ever larger, ever more scalable systems as well. You mentioned the moment the transformer came through being a major moment. I'm curious to explore the TPU's specific architecture, but it wasn't specific to the transformer specific. How do you kind of straddle the fine line of how specific you want your chip to be for the workload? This is a great question. And I think that it really comes down to the applicability. I mean, I think that of the chip to a particular workload. So in other words, in the end, we've been thinking about this for every generation. Would we further specialize? The question that we were facing, let's say two years ago, or a little bit more was, in 2026, should we have two chips or one? We could have one chip that could do inference and training. Simultaneously, and do both quite well. Or we could have two chips, one that was further specialized for inference, and the second one that was further specialized for training. This analysis and this work led to the release of two chips this year, eight I for inference, eight T for training. And in the end, what we realized is that it wasn't the case necessarily a couple of years ago. But by 26, we saw inference and serving really taking off. And so having a chip that would be significantly faster for serving that we thought might be 30, 40, 50, 60% of the market in a lifetime started making a lot of sense for us relative to if inference, if we projected inference to be 2%, or 5% of the market, even if that specialized chip is, let's say, 2x faster, it might not make sense. Because you'd actually go for the one general purpose chip that's not fully optimized, but that's OK, because you now have the uniformity, et cetera. So really, it does come down to a calculus question of, OK, would you further specialize? How big is that workload? How big is that workload projected to be in a couple of three, four years? Is this a sustained growth for a particular workload? in hardware again. And as you know, there is this opportunity where the more you specialize to a particular workload, the less flexible it is, the faster, the more power efficient the hardware is going to be. So it is this art and it's this projection of what are you designing to and how persistent is that workload. In other words, if it's going to go away after a month or two months or three months, even if it's big for those three months, you got a really narrow window to intercept it. So it has to be so much durable, and you have to be able to project exactly what when you can get for specializing to it. So the rough trade-off is there's a large fixed cost to support a new program. Yes. And you basically have to think that there's going to be enough demands for that specific program to justify the cost. Exactly. And to some, to some extent, you know, for example, for eight I and eight T chips, both chips can do the other workload. This is also key. If eight I could only do inference and I couldn't do training at all, you know, it was it had zero performance for training. And then vice versa, if a T was amazing at training had zero performance for inference, that would have also been a key limitation. Why? Because we would have to predict ahead of time over six-year period, lifetime of the hardware, exactly how much we need of each. In this case, it was nice because both chips are better at what they're specialized for. But if you needed to, if you had left over capacity in one place or the other, both can actually do the other other's job. Depending on the specialization you do, you might get so specialized that you actually limit yourself from being flexible, fungible. And if the rough trade-off then is kind of size of program on the other end, it seems to mean that so much of the modern AI market is transformer-based. And so maybe just ask the provocative question, why not just burn the transformer architecture into the chip? Yeah, so I think that it's transformer-based, but then the next level of question would be transformers in the end are about vector and matrix-multiply operations. And a soft max, there's a range of essentially linear algebra primitives. We have those, and others do as well, roughly baked into the hardware. It's all transformer-based, but then it's your model architecture is, okay, how many layers do you have? How do you go through the layers? How do you go across the layers for each dimension? What exact shape of matrices and vectors are you applying? You could go further and specialize to not just the transformer, but your model. That's the next level of specialization. I think there are a number of companies out there that are thinking about that. I think it's a very, very interesting direction as well. Okay, so at this point in time, do your customers view TPU and GPU as roughly fungible equivalents are, is there a certain set of problems that is better suited for one or the other? There's for sure better set of problems that are better suited for one or the other. I mean, GPUs are more general purpose than TPUs for one. That is clear. I mean, they're incredible products at Google and Google Cloud. We sell a lot of GPUs. We use GPUs internally. But I think it really then comes down to the specifics of your problem. So I think that our customers, there is overlap between the two. What are customers then evaluate their workload and evaluate their options? What we like to do at Google is give our customers choice. In other words, we want to have the right solution for their needs and of course provide the solution that best meets their needs for them. What is the case for co-design from the chips network to the software? And then what is the case against co-design? Yeah. So there's huge optimization opportunities with co-design. And so what you can imagine is that if you have an inlayer stack and you want to be able to pick and choose whatever component you want, let's say you're running across many clouds or you're running across many pieces of hardware, many pieces of software. You could design abstraction layers. That would basically say, I can run on any hardware. I can run on any software. I can run on any network topology, any amount of network that you give me. No problem, and my system is going to be fully adaptive very likely. So now you have a great capability. You can move anywhere. Like new capacity becomes available overnight, you're up and running because you've designed your system that way to actually be able to take advantage of anything. You have not hard coded or specialized at all to anyone's particular infrastructure. Downside is you probably leave a lot of performance on the table. If you become fully funcible, if you become fully flexible to anybody's hardware software network storage, computes, et cetera, stack. So the case for code designing is between each one of those layers, there's a big impedance mismatch if you try to get full generality. There might be 10%, 20%, 2x across each of these layers. You start multiplying those optimization opportunities through, and all of a sudden you're left with a big end-to-end opportunity in terms of whatever you want to say intelligence per watt or good put per watt that you can leverage. Even again, all the way down to power delivery and power availability, software optimizations, et cetera, et cetera. So pros are, you can run anywhere anytime, you have no lock-in. Cons are, you're leaving significant, not likely, significant amounts of performance on table. So my understanding is that if you took OpenAI and Anthropic, OpenAI was kind of primarily building on a homogenous compute stack, and Anthropic was building a roughly more heterogeneous compute stack. Do you think that's part of the reason why they converged on what is rumored to be very different architectures for their models? I can't speculate, I don't want to speculate in terms of what OpenAI and Anthropic are doing. There's one possibility, but I think that without knowing the details of what they're doing, I would imagine that there could be many reasons for why they wound up with different architectures. Well, what about for Google then? I'm curious what the working relationship looks like between your team and deep mind kind of who's in the room at what stage of model development, and how are you making decisions together on co-design? It's one of the most fun and frankly gratifying parts of being at Google is the opportunity to work really shoulder to shoulder with the deep mind team in terms of co-design of our hardware and models. There's a third element to do it in terms of that we also get to extend that with consumer services and cloud, I'll put that aside for a moment I can come back to that. But with respect to deep mind, it really is a deep partnership. So from the past, I can give you examples where they have come up with model optimizations, say to transformers or to particular math that they might want to do. And we might have a chip in progress, not quite done. But then they say, oh my gosh, if we had hardware support for this, our end-to-end training or serving might get significantly faster, more efficient. What would it take to actually now change our hardware definition that we might be an execution on to accommodate? And this then leads to our engineers and researchers getting together intensely in the same room for a few days, a week, two weeks saying, okay, yes, we can do this more likely, we couldn't quite do what you wanted. But we can do this other thing. And then maybe you can change your model architecture in this other direction that gives you 98%, that gives us 90% of what we're looking for. And yes, we can then go back and intercept the hardware. And or we can say, you know what, we're going to delay the tape out by a week or two weeks, because wow, for this level of benefit, it's totally worth it. Similarly, when we're projecting a roadmap about, and it's time for, we have many generations of chips that are essentially in progress at any point in time, we have the chips that are in production. That's one. We have the chips that we're working on getting into production. We're already back from the manufacturer and we're debugging them, making them work. We have the chips that are in implementation, that are about to tape out and go to the manufacturer. We have the chips that are in design phase, and then we have the chips that are in concept phase. So it's really this five, six stage many, many year pipeline from in production to in your mind, et cetera, the collaboration with deep mind for in production is significant. Because we get to work together in maximizing delivered intelligence or delivered good put per watt. And we know exactly what's happening in the model and we know exactly what's happening in the hardware and everything in between. We also get to collaborate deeply on though the chips that are actually just about to tape out. Why? Because we can intercept and we can make changes to the chip, literally chip architecture in flight, which would be somewhere between hard and impossible to do if we were working across company boundaries. Unimpossible. It would be much harder for us to say, oh my gosh, we're a few weeks or a few months away from getting this chip done. And now let's get in the same room, shoulder to shoulder and figure out if we should disrupt the program as possible, but but harder is what I would say. And then of course, for the chips that are in design, we have many architectures we can evaluate together. We can then ask our colleagues in deep mind, where do you see model architectures going in two, three years time? Here's the Pareto of things that we can do. Here's the Pareto of where model architecture is going. We have actually deep and significant simulation infrastructures that can predict how the workloads are going to map to different hardware architectures, deep, deep and fast iteration. It really isn't the teams are working separately. It's in same building, same rooms many times, deep daily interaction. I talk to whether it's Corei or Demas multiple times a week, etc. So it really is a super fun aspect of the work. That's awesome. And eventually their models will help with chip design. We're using Gemini to design hardware for future Gemini as well. I want to come back to that a little bit later on the collaboration itself. I guess is there an impedance mismatch still? I figure the cycle times are probably just slower when you're dealing with hardware than your deep mind folks get to deal with on the software side. And I figure your planning cycles are much further ahead. And so how much room do you actually have to adjust? Yeah, it's a really good question. We are planning hardware 2345 years in advance. No question. In other words, we talked about TP8. I and AT just now that we announced, but you can imagine that 910 and maybe some others are in concept execution to something else. And so they might be years out. If you're working with model architecture by default, you're not going to be thinking years out. But I think this is also the great thing about how the company is going up together. And you know, the worst Google research and deep mind and transformers being invented. All of this was happening in these overlapping rooms as well. So in other words, there's a whole generation of researchers who've grown accustomed to being able to influence the hardware. And knowing that the hardware is operating on multi-year cycles. And they also know that look if they have a small tweak that's going to deliver like 1% or 0.5% or something like that for a chip that's about to tape out, they're probably not going to come to us. Because they know enough to know that actually it's not like software where you can just do a change list and it's going to ship the production in two weeks time. Like it's actually stopping at a tape out is a big deal. But they also know if they've got a big like a really good opportunity. Yes, we're absolutely going to work together to figure out if we can get it in there. So as I said, it's multiplicative in terms of where the benefits come from. The hardware does lift all the tides, right? And so significant portions of the deep mind team, and we're so grateful for it. It's an amazing team. But significant portions of it are thinking about how do I influence the roadmap because it's actually a pipeline. Like the idea I had two years ago, like it's in production now. And it's helping all the workloads at Google go faster. Like that's a good feeling. It seems to be an impossible task though to predict in five years what workloads will be most common and what algorithmic breakthroughs will have occurred. Doesn't seem like an impossible task. I hear you that it would seem like an impossible task, but here's the awesome thing. And actually, we're working on writing this in great, great detail and it's a lot of fun to do it. The stunning thing is that the TPU architecture at a medium level of detail, not at a super high level detail, at a medium level of detail, hasn't really changed since TPU V1. Like one way to look at it is the instructions that architecture for a CPU. Like you've got loads and you've got stores and you've got ads and you've got subtracts and branches and like, and yet what has the software on top of it done right over over that period of time? Same thing with TPUs. We have some fundamental instructions and fundamental primitives. Of course, we've extended it. It's not like the instructions that hasn't gotten changed at all, but the primitives there in terms of specializing the numerics to very big, very large matrix multiply units. A sparse core that manages vector operations and scatter gather operations, etc. There's five or six things that really define a remote load store. That's another one. Actually, we can read and write remote memory through our ICI network. The fundamentals have been there and they've extended just to many generations of models, many generations of even deep neural network algorithms and model structures. Okay, speaking of shifting workloads, it seems like one of the biggest changes in workloads over the last year or so. I think it really started at the beginning of this year. This calendar year was the rise of the long horizon agent. I would guess that's a very different shape of workload than the quick-turn LLM conversations of years passed. What does that mean in terms of data center needs? There's two huge aspects to this. One is it's no longer human to, whatever you want to say, accelerate interaction. In other words, when you are typing at prompt on a web browser or on your phone or whatever, of course, in response to your prompt, there's going to be a bunch of work that happens, but then when the response comes back, you've got to read it. You've got to think about it and then maybe you have a follow-up. That's going to be multiple seconds of interaction time. Now on deep horizon agents, there's no human loop that is going to naturally rate limits how quickly requests are going to go to the model. This what went from seconds, maybe 10s of seconds in terms of interaction time, is not going into perhaps milliseconds. As soon as I get a response back, I can parse it. I can reason about it perhaps a bit and I can figure out what my next request is going to be. That's big change one. Big change two is all that reasoning and all that parsing is going to probably happen on a CPU. That CPU is then going to have to probably think about, okay, what other state do I need to go gather before making my next prompt back into the model? In other words, I've learned something from this response. I'm going to take another step, but I actually need to go grab some context, maybe from DRAM, local to me, maybe from someone else's DRAM on another CPU, maybe on SSD or maybe on HDD somewhere else. Now a huge amount of orchestration has to take place as well. The design actually is changing pretty significantly where the demand for accelerator compute is going up, but the demand for CPU and networking and storage, the traditional data center, CPU, etc. is also going through the roof. Is this something you're putting more CPUs alongside your GPU racks then? So this is the GPUTP racks. This is the key question is going back to this question of optimization and specialization. If we start putting lots of CPU racks and it is a question next to the GPUs and TPUs, that means that actually we can't fully specialize to the density and network requirements, let's say, of a TPU rack relative to a CPU rack. TPU rack is going to be more dense than a CPU rack. It's probably going to need more networking than a CPU rack. So in other words, now our building design is going to change. Another option is maintain your uniformity, put your TPUs or your GPUs on one building and the building next door. But maybe put your CPUs and maybe by the way, the hard drives have to be in another building on the other side because they have yet another set of requirements. Now you need networking between these buildings at a pretty significant level. So once you leave a building, the networking complexity goes up significantly from a reliability perspective, from a cost perspective, latency goes up probably acceptably, but still now you might go to hundreds of microseconds potentially more with queuing between the components. So the considerations do change in pretty interesting ways. Your job is hard. It's fun. It's fun. Yeah. What's happening on the networking side? And I've heard that Google has always been at the forefront of the newest in networking, including optical. Can you say we're on what is like the state of optical networking? You know, we at Google, this was probably 15, 16 years ago, where among the first to bring essentially what's called wave division multiplexing, where you could put multiple signals on a single fiber within the data center. And we actually leverage that for all of our communication between racks. At the same time, we introduced technology along with the wave division multiplexing called optical circuit switching. And essentially what optical circuit switching does is in contrast with traditional electrical packet switching, what it does is it transmits and moves data entirely in the optical domain. The great thing about that is, and so let me describe the technology that under pinsets in a packet switch, you would take a packet and has a header, you would look at it in the electrical domain, figure out where the packet is headed. In its header, it might have an IP address. That says, okay, where do I head it? You look up, okay, for that destination, you look up in a table, what port do I forward it along? So basically billions, billions and billions, perhaps trillions of packets coming through at super high speed per second. You're forwarding them along. Optical circuit switching says, I'm not touching these bits in the electrical domain. What I'm going to do is I'm going to figure out for an input port, which output ports to send the light to. Okay, and now I have there's multiple ways to do this. The one that we started with is called MEMS switches, micro electrical motors. That basically control mirrors in 3D. So we can now programmatically take a box that might have you pick kind of 28 ports, 256 ports, some number like that, and we can configure every input port for a fiber that comes into it, map it to an output port, and then change the rotation of mirrors where the light literally shines down on these mirrors and gets reflected to the right out the port. Initially, the reason we did this twofold was to create locality between groups of racks. Let's say I had a compute cluster and a storage cluster and both of them were in support of again making it up search. We knew that these two clusters would talk to each other a lot, so we would configure the mirrors to create shortcuts purely optically between those two clusters, clusters of racks. That was reason number one, reason number two was we wanted to be able to expand the network and contract the network without actually moving any fiber. And without working into the details, I could draw this on a board, the optical circuit switch would allow you to actually reconfigure the spine of the network to expand it or shrink it without a human being having to do anything that be literally a controller that would manage that. Now fast forward to TPUs. A TPU has a torus topology that connects all the TPUs to one another directly. I talked about throughput and good put earlier. One of the things that we can do is if we have a TPU rack that fails, we can replace it with another TPU rack without moving any fiber. Again, I'd have to wave my hands or draw out a whiteboard, but essentially we can say we have a spare rack available at all times. And when a rack fails, we redirect the light to that new rack. And that can be done in milliseconds. Why do you have the fiber at all then? As opposed to fully free space. Yeah, it's a very good question. Attinuation loss and bandwidth would drop dramatically. Furthermore, across the range of a very large building, aiming everything without the benefit of fiber to connect it all together in 3D would be challenging to possibly impossible. We've talked about it. We've talked about it actually, and there've been some really interesting discussions. But yes, it's mostly in fiber, but then when they hit the optical circuit switch, essentially the light then literally shines down on these tiny chips. So that's one big direction of networking. But there's a lot. I mean, I would say networking is exploding in terms of its capabilities and need, frankly, in the data center. So cool. We've got an entire conversation on that. Yes, it is very, very cool. Even like that going back to the picture from an ethical, it was all the cables that that kind of exercised. Exactly. Yeah, and those cables eventually, some of them wind up at an optical circuit switch in our data centers. Make sense. Okay, I want to talk about power. You've been talking about good put per watt and other units per watt makes me think per watt means power is kind of the binding constraints or the scarce constraints or the expensive constraints in some way. You know, so I get asked this question, what is the biggest constraint that we face? And the reality is there is no single biggest constraint that we face. They're all constraints. They're all super hard. It could be and they shift continuously. But if I had to answer fundamentally, I would say the power is the single most fundamental constraint that we face. Like everything else seems like we know how to solve them and it's a question of solving them over some period of time. Power, yeah, I think the way that you put it is really nice. It's a it's a binding long-term issue that we do not have a, I mean, you know, nuclear, you know, perhaps nuclear is going to abundant clean energy, which would solve a lot of problems for sure when that happens and when it happens at scale, still still unknown. And so how does it work in practice? You know, you're standing up a new data center. It needs gigawatt of power. I imagine you can't just call PG&E and say, hey, please send a gigawatt of power. So what does provisioning power actually look like? And are you having to actually radically integrate all the way down to like, you know, doing your own turbines? Or how do you solve the power bottleneck? Yeah, it's again, it's a it's a big question and important question. We do our preferred model at Google is always to be utility connected, to be good connected. So it's the equivalent of calling your. Oh, so you can't just call PG&E. Exactly. You call very very politely your favorite utility wherever it is that your data center is. And of course, you give them many, many years of notice. So in other words, if we're talking about a gigawatt scale, it's not something that you can say, hey, I need to give a lot tomorrow. When can you start building me? It's something that we co-blend plan together. You know, for us, it's something that we also take very seriously from the perspective of ensuring that when we work with these utilities, the costs of putting that infrastructure in place, that we could get into a long conversations, a long conversation just on this topic as well, that we cover those costs because with the way that building works, it actually could be that by the act of the utility building up capacity for us, let's say, other people's rates could go up. In theory, what we ensure is that actually, let's say the transmission lines that have to be built, upgraded, additional utility based stations, et cetera, that we pay for those as well. But so it is a long planning process. It can absolutely be the case that in, let's say that we need a gigawatt in, I'll make up a date, 2028, and the utility can get us a gigawatt in 2029. I can get us, let's say, 700 megawatts in 2028. So now we might be left with a question of how do we cover those 300 megawatts? Or one answer is just wait. Another answer is to say, okay, well, would we figure out how we generate some subset of that power ourselves? And maybe that would be with solar cells or with batteries as a backup, et cetera, but it'd be for other sources. So then we again work with the utility. So it might also be a combination where we might maintain some powered generation local and have the capability even when the utility comes online fully, let's say the gigawatt scale, where we could actually provide power back to the grid. So having that, when they need it as well. So in other words, there might be the one way to look at it is there might be the two weeks of the year, maybe it's the hottest two weeks of the year, where there's huge amount of residential demand. If we have some local generation, we can then provide that back to the grid as well. So it really is working over multiple years with the utilities for us. Why is your preference to do that versus to kind of go like to work with the utilities as opposed to to kind of vertically integrate yourselves? Yeah, so the main main reason is flexibility and uplift on both sides. So one way to look at it is statistical multiplexing or if you want the law of large numbers. If we need to have a gigawatt of power, let's say we wanted it to have that with 99.99% plus reliability. That means we have to build two gigawatts of power. At that level, 99.99 or 99.99, you have to have one plus one redundancy. That gets expensive. And then making sure that that's going to be ideally a clean energy source, probably right next to our data center, that can also be challenging. Now if we partner with the data center, again, maybe we have some some amount that that we can bring ourselves, that we can give to the grid when they need it less, that we can take their power. So in other words, by leveraging that statistical multiplexing over much larger base, actually everybody wins. We win the grid wins, residences win, et cetera. We prefer that. And in rare, rare cases, we will do it, let's say behind the meter. But even then, we're doing an assumption that we're going to work with the utility where it might be a year later. We want to be connected to the grid. Again, it's an uplift for us. It's an uplift for the grid. Makes sense. How did this side help big to make a data center? Yeah, that's an art. And it's a source of significant debates. You know, at some point, you know, we had a debate. I remember even 10 plus years ago, 15 years ago, big debate at Google, should we just put everything into one data center? Like back then, it was going to be a gigawatt, which was important. Yeah, different times, like 10, 15 years old. We're going to have a gigawatt data center. So one obvious concern there is a single point of failure, right? If you're looking at things from a 30 year perspective, that's a huge concern. You know, on the other hand, if you're talking about training workloads today, bigger is better. And that was having more because from a networking perspective, actually, you want to have things concentrated in as small a distance as possible. But then again, two issues, single point of failure, but then also now power availability. By while a gigawatt was huge 10 or 15 years ago, that imaginable, there's no way anywhere in the country or the world we're going to get the total requirements of Google built in in one place. It's just not going to be possible. So now what's the optimum size? Again, we have models for this, simulators, et cetera. But this, it also depends on looking some places we're going to be at the edge of the network or we're going to be in country. That might be tens of megawatts. We actually partner with ISPs. That might be a rack, like literally, it could be a rack. This is a training cluster. Okay, maybe that's going to be closer to a gigawatt. Some other sites might be hundreds of megawatts, etc. Interesting. I love to understand how you think about the portfolio lifecycle management. So I guess my guess would be that, you know, the biggest newest clusters are used for training the latest frontier model. And then you kind of recycle all the other stuff and run inference on it. Is that like a fair framework? Are you also standing up inference specific clusters? How does that all work? Very reasonable framework that you're thinking about. And I think it makes a lot of sense, but I would say that the demand for inference is such that we can't just rely on whatever older training clusters that are no longer being fully used just for training. as the basis for inference and also if you think about it, we might centralize again in a particular year into a small number of large sites, our training clusters. And there is benefits to keeping the network distance between them small. So now, let's wherever they're located in the world, they're probably going to be let's say on the same continent, or they might be even the same portion of a continent in a particular year. So now you might be left with not enough serving capacity on the other continents, et cetera. So then, actually, we then have to go build this specialized inference elsewhere across the world. So I think your intuition is spot on, but not wholly. In other words, it really does have to be, okay, here are the training clusters. Yes, probably they're going to be used for serving in some number of years. But then we're also having to build the serving clusters as well. - And your serving clusters are they different than the training clusters? Like, are they smaller, are they cheaper per megawatt? - Not necessarily cheaper, actually, because for serving, there is more need to co-locate a compute networking and storage. And so that then we get to the inability to specialize. So for training, you actually have this big density, uniform deployments, et cetera. Whereas for serving, you're going to have to have the mix of storage, compute, and accelerators. Furthermore, for, it's a very interesting aspect of this that we could go into more detail on as well. But for serving, you actually don't want to have too much in one place. You want to be serving your workloads from all over the planet. But now we wind up having individual model endpoints, and that actually can be variations of models. So now we have to spread these models out across the world, also accounting for locality. So they will be smaller, they'll actually be less vertically integrated, probably, in the inference side. - Super interesting. So if you made a data center five years ago, state of the art accelerator that five years ago was very different, vastly less efficient than the ones that are being made today. Do you actually go back and swap out the chips in those old data centers? And this kind of relates to there's been an ongoing debate, I think, of what is the actual useful life of a chip? - Yeah, so I've been on record as saying this and one of my more, I was surprised by how much pick up this had, but you know, I said that our seven and eight year old TPUs are still at 100% utilization. - Wow. - And. - I think I saw this, I didn't know this was 20%. - Yeah, I didn't mean for it to be a meaningful statement, but it was a meaningful statement, apparently. Yeah, so our older TPUs, GPUs, but our older TPUs are seeing significant utilization. We do replace them in the end, there's a question of, okay, they have the depreciation lifetime as approximately six years. So once they're fully depreciated and given the power efficiency of newer generations, et cetera, it does make sense to replace them and upgrade them. It's not that we do replace the chips, but it's really the systems. So in other words, we think in terms of pods. So a TPU, let's say a T pod might be 9600 chips and it might be 140 something 152 racks, et cetera. So then we would say, okay, we're gonna pull out that pod and we're gonna replace it with a, whatever it is, TPU 12 or 13 or 14 pod. It might not be a perfect fit. That would, then we have to, in other words, the new pod's footprint might not be a perfect fit for the old pods vacancy. We then just have to account for that. And we have to figure out how we would retrofit. We can't plan that because we don't know what that many generations of TPUs are gonna be. So then it's again, a bit of an art to figure out how we would, and it's actually a hard work, figure out how we would decom and then replace as quickly as possible with new TPUs. - You've written publicly about open standards. Can you say it more than that? - Yeah, so I think that's, we talked about this interoperability question. And so for us, while we support vertical integration and we make it possible to extract just as much performance as you want, for us is really important to not force lock-in and not force a sort of wild garden in terms of how the system works sentence. So I'll give one example. At Google, we've developed a model development framework called Jax. We like it a lot. We think it's really, really good. And we use it extensively internally. Many of our customers like PyTorch. And so one thing we could say is, hey, if you wanna run on TPUs, you gotta use Jax. It's the best, I mean, I'm being a facetious a little bit, but maybe there's maybe there's not. We think it's the best. And that's your only choice because it's so great. Or we could say, look, if you like Jax, we like Jax, if you like Jax, you can use it. But if you like PyTorch, we have Torch TPU where your unmodified models, et cetera, can run. We've seen this throughout history, actually with many, many examples, I've used the example of IP. Why did the internet protocol win? There were actually many competing protocols to IP. This is ancient history in the '70s and early '80s. Why did IP win? It was because it was open standard and it was this narrow waist to the hourglass where anything could run on top in terms of software and anything could run underneath it in terms of hardware. So open standard, interoperable. Anyone who brought IP could plug into a router port and become part of the internet. It was beautiful. And that's what allowed the internet to explode in its growth and reach across the world. So we really do believe in those open standards in terms of plug-and-points. Now, if you want the plug-and-something highly specialized, you can. If you think that you've got a better thing to plug into our framework, you absolutely can. But we want to really support open standards, ideally open source to run it as well. It's too big and too important to build out to be, you know, anyone vendors closed proprietary standards. Yeah, we really believe that. And it's got to be one of choice. And that's also why, for example, we fully support and have TPUs, GPUs, other accelerators, et cetera. Yeah. How has day-to-day life for your team changed with AI? Where is it changing your function the most? So I think the-- whatever you want to say, the easiest answer is on the software engineering side, where it's been documented externally quite a bit. So I think that we are at Google and my team using it to great effect in terms of our software developments capabilities, but also, frankly, tests roll out, even helping with design, et cetera. But there have been on the hardware side, which has maybe gotten less external coverage, also significant change. In other words, my hardware engineers-- I was just looking at the numbers earlier today, in fact-- are using AI, using whatever-- the token counts, if you want, not the best metric, but it's still metric. Our hardware engineers are using AI as much as the software engineers are. And productivity has gone up time to-- time from design kickoff to tape out is shrinking. Time for bring-up is shrinking. So another worst productivity is going up significantly. But then other, maybe less expected changes, how we do data center design has changed significantly. In other words, how we evaluate-- you mentioned, hey, do we do a gigawatt building or 100 megawatts campus or 200 megawatt campus? In the past, this would be very detailed, very sort of spreadsheet-driven, human-driven processes. And it still is, to some extent, but there's a lot of AI now involved that really streamlines the process in terms of planning and development as well. Interesting. So the reasoning models are-- I wouldn't say quite yet reasoning models. It's not replacing human judgment, but it's making it much easier to bring the necessary information together in one place and basically put the right information in front of the humans making the decisions. OK, I'm going to bring us home with two-- kind of out there, kind of fun questions. Question number one, orbital data centers. I've seen that Google is thinking about this quite seriously, and you want me to comment on that. But I mean, does the fact that people are seriously running the numbers on orbital compute to mean that there are kind of serious binding constraints on Earth? And what do you think of orbital data centers? Yeah, it's an exciting direction. We are actually pursuing it. And we've referred to it with no tongue in cheek as a moonshot, as one of our big efforts that we're excited about investing in. It goes back to the earlier part of the conversation where you raised, I think, correctly, that in terms of fundamental constraints, energy and energy production is a key key challenge. And so really, bottom line is, from a fundamental's perspective, in space, you have something like 40% more power available because of lack of attenuation and atmosphere, et cetera. In other words, it's just more solar capacity, 1.4x. So that's one part of it. But in a sun synchronous orbit, you have 98% to 100% coverage of sunlight on your solar cells, relative to 28%, maybe 35% on land. In other words, just this enormous amount of power, obviously the sun. You take the 1.4x and you take the 3 to 4x. in terms of number of hours per day, you remove batteries more or less from the equation. And now you have the potential for something that can really end up, of course, carbon-tree. Lots of benefits, lots of challenges. Lots and lots of challenges. So in other words, okay, now what about cooling? You know, naively, you might think cooling in spaces is easier, it's actually harder. Reliability, we talked about how these things fail sometimes. So repairs becomes harder, not impossible. It becomes harder in space, networking, and exactly, so perhaps it'll be that this model is a promising direction. Redundancy will probably be your friend. Your pressions question on free space optics is now going to become reality. We're probably not going to be stringing fiber between these components. So it will actually be free space. And we're going to have the lasers pointing at the receivers and calibrating in real time. These are there are no showstoppers here, no fundamental showstoppers. At last question, I've had this image of the ineffable big supercomputer that you built them in my head this whole time. And so here's the question. 10 years from now, what will the most frontier supercomputer look like? Oh my gosh, yes, 10 years is right at that edge where it's, I would say, in all sincerity, probably some people are thinking about what the 2036 computer looks like. We might have a few thinking that far ahead. But wow, the cone of uncertainty there is way way too wide. Like in those, if you look at the trends, the level of integration is going to be tremendous. So we saw the beautiful fiber in the VR200 racks that we put together for ineffable. My guess is it's going to be more integrated. Less fiber to, I won't say no fiber in 2036, but I think that probably from a rack perspective, the rack will look much more tightly integrated. And the amount of fiber, there'll be maybe a small fiber bundle coming out of the rack. And then some of the words one view you might have from a modular manufacturing perspective is these racks, likely in 2036, are going to be manufactured centrally. And so whether they have 72 or 144 or 288 or probably more, you know, 576, 1152, pick your favorite multiple of GPUs, since we've talked about the ineffable case, but then be the same for the GPUs, deeply integrated into a rack, what a rack be multiple megawatts. You know, we don't know exactly how, but 2036, we get to, we get to imagine things, could be multiple megawatts in a single rack. And now you bring water and you bring power and you bring fiber, right? You, you, we will that rack in, you plug those three things in and you off, off to the, off to the races as well. Okay, so it's not going to be like a big alien orb then space by 2036. I wouldn't say that it's not possible for 2036 where to be then directly launched into space and then maybe taken by a robotic arm at some space station and then plugged into the right module. Yeah, maybe that for 2036. Fun, fun to think about. I really enjoyed this conversation. Yeah, this is the most intense biggest cat backstage buildout in history, but I also think it's, it's a technology revolution revolution that is a thing of beauty. Yeah, and I think you have such a grasp over, you know, the beauty of the technology and and the binding constraints and how to balance this, this all. Google is in good hands. Thank you for taking a time to share with you. Yeah, it's a ton of fun. We get to live, we get to live through this and we get to define it. So, thank you very much. It's a great conversation. Thank you. (gentle music)

Podcast Summary

Key Points:

  1. AI data centers are increasingly purpose-built and co-designed with specific workloads, unlike traditional data centers that follow long-term, generic planning horizons.
  2. Specialization improves performance and power efficiency, but requires a durable, long-term projection of workload demand to justify the high upfront investment.
  3. Google’s AI infrastructure team prioritizes "good put" — real-world workload performance — over theoretical metrics like flops, as actual system reliability and failure recovery are critical.
  4. At scale, hardware failures are inevitable, and continuous telemetry monitoring is essential to detect and respond to failures in real time across thousands of chips.
  5. The TPU program evolved from a contrarian bet in 2013 to a foundational technology powering AI workloads, including transformers, recommender systems, and large-scale training.
  6. Google’s hardware and software teams collaborate deeply in co-design, enabling joint innovation where model needs directly inform chip architecture and vice versa.
  7. As long-horizon agents grow in popularity, data centers must adapt with increased CPU, networking, and storage demands, challenging traditional designs and requiring hybrid, distributed architectures.
  8. Open standards and interoperability remain key principles, allowing flexibility and avoiding vendor lock-in, while still enabling high-performance, specialized hardware solutions.

Summary:

Google’s AI data center buildout represents one of the most capital-intensive and transformative infrastructure shifts in human history. Unlike traditional data centers designed for 20–30 year horizons, AI data centers are now being co-designed with specific workloads, enabling greater specialization, efficiency, and performance. This shift is driven by the rise of AI workloads like long-horizon agents, which demand not just more compute but also increased CPU, memory, and networking capacity.

Google’s approach emphasizes "good put"—real-world workload performance—over theoretical metrics such as flops, as system reliability and failure resilience are paramount at scale. The company’s TPU program, started as a contrarian bet in 2013, has matured into a core enabler of AI, evolving from inference to training and beyond. Deep collaboration between hardware teams and DeepMind enables iterative co-design, where model innovations directly shape chip architectures and vice versa.

As AI workloads grow more complex and distributed, data center designs must balance specialization with flexibility—such as separating compute, storage, and network elements across physical locations. Power remains the most fundamental constraint, requiring long-term utility partnerships and strategic energy planning. Google also champions open standards and interoperability, ensuring that hardware and software remain flexible and accessible, even as performance demands increase.

This holistic, dynamic approach allows Google to maintain agility, performance, and innovation in an era of rapid AI transformation.

FAQs

The main difference is specialization. AI data centers are co-designed with specific workloads, like training or inference, leading to optimized power, cooling, and networking. Non-AI data centers are typically more generic, built for long-term versatility over 20–30 years with less focus on specific hardware demands.

We focus on 'good put'—the actual performance delivered by real workloads. This measures how much useful output is generated per unit of time or energy, rather than just the theoretical maximum capacity of hardware.

Specialization improves speed and power efficiency for specific workloads but reduces flexibility. If the workload fades quickly—like a temporary spike—building around it becomes inefficient and costly due to long hardware lifecycles and high upfront investment.

No, they are not fully interchangeable. GPUs are more general-purpose, while TPUs are optimized for specific AI workloads like training and inference. The best choice depends on the workload’s needs, such as matrix operations and memory access patterns.

Google tracks failure rates, failure recovery times, and workload slowdowns. They use real-time telemetry to detect issues and maintain high availability, ensuring that even if one component fails, the system can recover efficiently without losing significant progress.

Co-design allows deep collaboration between hardware teams and AI researchers to optimize performance. For example, models may suggest new hardware features, and hardware teams can then adapt chips to support those needs, leading to better efficiency and faster training.

Chat with AI

Loading...

Pro features

Go deeper with this episode

Unlock creator-grade tools that turn any transcript into show notes and subtitle files.